United States › Grid › Interconnection queues › Washington
HYDRO · WESTEsquatzel Project
Esquatzel Project is a 2.0 MW hydro request built and operating in the West interconnection queue, in Franklin County, Washington, connecting to Green Energy Today, LLC.
Request details
- Queue ID
- G0441
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Green Energy Today, LLC
- Developer
- Green Energy Today, LLC
- Connection point (POI)
- Pole 66 G 129 at the Esquatzel Canal and Columbia River Road
- Location
- Franklin County, Washington
- Technology
- Hydro: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 3 November 2010
- Agreement signed
- 10 August 2011
- Proposed online date
- February 2011
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Franklin County
- Battery storage project CS23-12, Franklin CountyBattery storage · 199 MW · agreement signed
- Solar + storage project 99, Franklin CountySolar + storage · 200 MW · in study
- Solar project G0689, Franklin CountySolar · 13.3 MW · in study
- Battery storage project G1079, Franklin CountyBattery storage · 10.0 MW · in study
- Solar project G1004, Franklin CountySolar · 10.0 MW · in study
- Solar + storage project TCS-08, Franklin CountySolar + storage · 200 MW · withdrawn
- Solar + storage project C1-36, Franklin CountySolar + storage · 200 MW · withdrawn
- Solar + storage project C4-013, Franklin CountySolar + storage · 199 MW · withdrawn
- Solar + storage project CS24-08, Franklin CountySolar + storage · 199 MW · withdrawn
- Solar project G0564, Franklin CountySolar · 80.0 MW · withdrawn
- 01 37MW ConnellGas · 37.0 MW · withdrawn
- 02 37MW Franklin PUD,Franklin RiverviewGas · 37.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem