United States βΊ Grid βΊ Interconnection queues βΊ Washington
GAS Β· WEST01 37MW Connell
01 37MW Connell is a 37.0 MW gas request withdrawn in the West interconnection queue, in Franklin County, Washington, connecting to Effective Energy Corporation.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G70-01
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Effective Energy Corporation
- Developer
- Effective Energy Corporation
- Connection point (POI)
- BPA's Connell Substation
- Location
- Franklin County, Washington
- Technology
- Gas: 37.0 MW
- Total requested
- 37.0 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 14 August 2001
- Proposed online date
- June 2002
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Franklin County
- Battery storage project CS23-12, Franklin CountyBattery storage Β· 199 MW Β· agreement signed
- Solar + storage project 99, Franklin CountySolar + storage Β· 200 MW Β· in study
- Solar project G0689, Franklin CountySolar Β· 13.3 MW Β· in study
- Battery storage project G1079, Franklin CountyBattery storage Β· 10.0 MW Β· in study
- Solar project G1004, Franklin CountySolar Β· 10.0 MW Β· in study
- Esquatzel ProjectHydro Β· 2.0 MW Β· built
- Solar + storage project TCS-08, Franklin CountySolar + storage Β· 200 MW Β· withdrawn
- Solar + storage project C1-36, Franklin CountySolar + storage Β· 200 MW Β· withdrawn
- Solar + storage project C4-013, Franklin CountySolar + storage Β· 199 MW Β· withdrawn
- Solar + storage project CS24-08, Franklin CountySolar + storage Β· 199 MW Β· withdrawn
- Solar project G0564, Franklin CountySolar Β· 80.0 MW Β· withdrawn
- 02 37MW Franklin PUD,Franklin RiverviewGas Β· 37.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem