United States › Grid › Interconnection queues › Washington
SOLAR · WESTSolar project G0689, Franklin County
Solar project G0689, Franklin County is a 13.3 MW solar request in interconnection study in the West interconnection queue, in Franklin County, Washington.
- PlanningQueued Sep 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- G0689
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Connell Tap on the Benton-Scooteney line.
- Location
- Franklin County, Washington
- Technology
- Solar: 13.3 MW
- Total requested
- 13.3 MW
- Service type
- NRIS and ERIS
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 7 September 2021
- Proposed online date
- December 2023
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Franklin County
- Battery storage project CS23-12, Franklin CountyBattery storage · 199 MW · agreement signed
- Solar + storage project 99, Franklin CountySolar + storage · 200 MW · in study
- Battery storage project G1079, Franklin CountyBattery storage · 10.0 MW · in study
- Solar project G1004, Franklin CountySolar · 10.0 MW · in study
- Esquatzel ProjectHydro · 2.0 MW · built
- Solar + storage project TCS-08, Franklin CountySolar + storage · 200 MW · withdrawn
- Solar + storage project C1-36, Franklin CountySolar + storage · 200 MW · withdrawn
- Solar + storage project C4-013, Franklin CountySolar + storage · 199 MW · withdrawn
- Solar + storage project CS24-08, Franklin CountySolar + storage · 199 MW · withdrawn
- Solar project G0564, Franklin CountySolar · 80.0 MW · withdrawn
- 01 37MW ConnellGas · 37.0 MW · withdrawn
- 02 37MW Franklin PUD,Franklin RiverviewGas · 37.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem