United States βΊ Grid βΊ Interconnection queues βΊ Washington
SOLAR + STORAGE Β· WESTSolar + storage project TCS-08, Franklin County
Solar + storage project TCS-08, Franklin County is a 200 MW solar + storage request withdrawn in the West interconnection queue, in Franklin County, Washington, connecting to Avista Utilities.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2019 (completed)
- Withdrawn / abandonedSep 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- TCS-08
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avista Utilities
- Connection point (POI)
- Saddle Mt-Walla Walla 230kV line
- Location
- Franklin County, Washington
- Technology
- Solar: 200 MW Β· Battery
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Request Status: Withdrawn; Facilities Study: N/A; Phase One Cluster Study: N/A; Phase One Re-Study: N/A; Phase Two Clust
- Queue status
- Withdrawn
- Entered queue
- 6 September 2019
- Proposed online date
- December 2021
- Withdrawn
- September 2022
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Franklin County
- Battery storage project CS23-12, Franklin CountyBattery storage Β· 199 MW Β· agreement signed
- Solar + storage project 99, Franklin CountySolar + storage Β· 200 MW Β· in study
- Solar project G0689, Franklin CountySolar Β· 13.3 MW Β· in study
- Battery storage project G1079, Franklin CountyBattery storage Β· 10.0 MW Β· in study
- Solar project G1004, Franklin CountySolar Β· 10.0 MW Β· in study
- Esquatzel ProjectHydro Β· 2.0 MW Β· built
- Solar + storage project C1-36, Franklin CountySolar + storage Β· 200 MW Β· withdrawn
- Solar + storage project C4-013, Franklin CountySolar + storage Β· 199 MW Β· withdrawn
- Solar + storage project CS24-08, Franklin CountySolar + storage Β· 199 MW Β· withdrawn
- Solar project G0564, Franklin CountySolar Β· 80.0 MW Β· withdrawn
- 01 37MW ConnellGas Β· 37.0 MW Β· withdrawn
- 02 37MW Franklin PUD,Franklin RiverviewGas Β· 37.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem