United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR + STORAGE Β· PJMElder West
Elder West is a 20.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Erie County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2019 (completed)
- Withdrawn / abandonedNov 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF1-104
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Erie West 34.5 kV
- Location
- Erie County, Pennsylvania
- Technology
- Solar: 20.0 MW Β· Battery
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 10 September 2019
- Proposed online date
- October 2026
- Withdrawn
- November 2024
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Erie County
- French Creek Solar and BESSSolar + storage Β· 150 MW Β· agreement signed
- Wilson SolarSolar Β· 80.0 MW Β· agreement signed
- Union City 34.5 kVSolar Β· 12.0 MW Β· agreement signed
- Battery storage project AI1-188, Erie CountyBattery storage Β· 130 MW Β· in study
- Solar project AI1-030, Erie CountySolar Β· 5.0 MW Β· in study
- Solar project AH2-014, Erie CountySolar Β· 5.0 MW Β· in study
- Erie East EnergyBattery storage Β· 160 MW Β· suspended
- Greenfield CSG 1Solar Β· 4.0 MW Β· suspended
- Great Lake GrowersSolar Β· 2.6 MW Β· suspended
- Erie SolarSolar Β· 20.0 MW Β· built
- Gas project B50, Erie CountyGas Β· 500 MW Β· withdrawn
- Gas project M15, Erie CountyGas Β· 302 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem