United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· MISOSolar project J2387, Stoddard County
Solar project J2387, Stoddard County is a 50.0 MW solar request withdrawn in the MISO interconnection queue, in Stoddard County, Missouri, connecting to AMEREN MISSOURI.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2387
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN MISSOURI
- Connection point (POI)
- Stoddard 161 kV Substation
- Location
- Stoddard County, Missouri
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- December 2025
- Withdrawn
- October 2025
Location
Marker shows the centre of Stoddard County; the queue data does not give exact sites.
Other requests in Stoddard County
- Solar project J1034, Stoddard CountySolar Β· 225 MW Β· under construction
- Solar project J2524, Stoddard CountySolar Β· 200 MW Β· in study
- Solar project J3337, Stoddard CountySolar Β· 230 MW Β· withdrawn
- Battery storage project J3906, Stoddard CountyBattery storage Β· 140 MW Β· withdrawn
- Solar project J782, Stoddard CountySolar Β· 100 MW Β· withdrawn
- Battery storage project J1033, Stoddard CountyBattery storage Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem