United States βΊ Grid βΊ Interconnection queues βΊ Missouri
BATTERY STORAGE Β· MISOBattery storage project J1033, Stoddard County
Battery storage project J1033, Stoddard County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Stoddard County, Missouri, connecting to Ameren Missouri.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1033
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Ameren Missouri
- Connection point (POI)
- Stoddard - Morely 161 kV Line Tap
- Location
- Stoddard County, Missouri
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- October 2021
- Withdrawn
- March 2021
Location
Marker shows the centre of Stoddard County; the queue data does not give exact sites.
Other requests in Stoddard County
- Solar project J1034, Stoddard CountySolar Β· 225 MW Β· under construction
- Solar project J2524, Stoddard CountySolar Β· 200 MW Β· in study
- Solar project J3337, Stoddard CountySolar Β· 230 MW Β· withdrawn
- Battery storage project J3906, Stoddard CountyBattery storage Β· 140 MW Β· withdrawn
- Solar project J782, Stoddard CountySolar Β· 100 MW Β· withdrawn
- Solar project J2387, Stoddard CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem