SOLAR Β· MISOSolar project J3337, Stoddard County
Solar project J3337, Stoddard County is a 230 MW solar request withdrawn in the MISO interconnection queue, in Stoddard County, Missouri, connecting to AMEREN MISSOURI.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3337
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN MISSOURI
- Connection point (POI)
- 5VANDUSER
- Location
- Stoddard County, Missouri
- Technology
- Solar: 230 MW
- Total requested
- 230 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 16 April 2024
- Proposed online date
- March 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Stoddard County; the queue data does not give exact sites.
Other requests in Stoddard County
- Solar project J1034, Stoddard CountySolar Β· 225 MW Β· under construction
- Solar project J2524, Stoddard CountySolar Β· 200 MW Β· in study
- Battery storage project J3906, Stoddard CountyBattery storage Β· 140 MW Β· withdrawn
- Solar project J782, Stoddard CountySolar Β· 100 MW Β· withdrawn
- Battery storage project J1033, Stoddard CountyBattery storage Β· 50.0 MW Β· withdrawn
- Solar project J2387, Stoddard CountySolar Β· 50.0 MW Β· withdrawn