BATTERY STORAGE Β· MISOBattery storage project J3906, Stoddard County
Battery storage project J3906, Stoddard County is a 140 MW battery storage request withdrawn in the MISO interconnection queue, in Stoddard County, Missouri, connecting to AMEREN MISSOURI.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedJan 2026 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3906
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN MISSOURI
- Connection point (POI)
- 5STODDARD - 5MORLEY (AECI) 161.0kV
- Location
- Stoddard County, Missouri
- Technology
- Battery: 140 MW
- Total requested
- 140 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 12 March 2025
- Proposed online date
- May 2030
- Withdrawn
- January 2026
Location
Marker shows the centre of Stoddard County; the queue data does not give exact sites.
Other requests in Stoddard County
- Solar project J1034, Stoddard CountySolar Β· 225 MW Β· under construction
- Solar project J2524, Stoddard CountySolar Β· 200 MW Β· in study
- Solar project J3337, Stoddard CountySolar Β· 230 MW Β· withdrawn
- Solar project J782, Stoddard CountySolar Β· 100 MW Β· withdrawn
- Battery storage project J1033, Stoddard CountyBattery storage Β· 50.0 MW Β· withdrawn
- Solar project J2387, Stoddard CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem