United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
BATTERY STORAGE Β· MISOBattery storage project J1101, Manitowoc County
Battery storage project J1101, Manitowoc County is a 20.0 MW battery storage request withdrawn in the MISO interconnection queue, in Manitowoc County, Wisconsin, connecting to American Transmission Co..
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- ConsentedApr 2021 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1101
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- American Transmission Co.
- Connection point (POI)
- Kewaunee 138kV Substation
- Location
- Manitowoc County, Wisconsin
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Agreement signed
- 12 April 2021
- Proposed online date
- August 2023
- Withdrawn
- November 2025
Location
Marker shows the centre of Manitowoc County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Manitowoc County
- Solar project J886, Manitowoc CountySolar Β· 150 MW Β· built
- Solar project J505, Manitowoc CountySolar Β· 99.0 MW Β· built
- Gas project G240, Manitowoc CountyGas Β· 55.0 MW Β· built
- Nuclear project G834, Manitowoc CountyNuclear Β· 53.0 MW Β· built
- Nuclear project G833, Manitowoc CountyNuclear Β· 53.0 MW Β· built
- Nuclear project J022, Manitowoc CountyNuclear Β· 6.0 MW Β· built
- Nuclear project J023, Manitowoc CountyNuclear Β· 6.0 MW Β· built
- Gas project J383, Manitowoc CountyGas Β· 571 MW Β· withdrawn
- Onshore wind project J094, Manitowoc CountyOnshore wind Β· 200 MW Β· withdrawn
- Battery storage project J2218, Manitowoc CountyBattery storage Β· 150 MW Β· withdrawn
- Onshore wind project J657, Manitowoc CountyOnshore wind Β· 101 MW Β· withdrawn
- Onshore wind project G384, Manitowoc CountyOnshore wind Β· 99.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem