BATTERY STORAGE Β· MISO

Battery storage project J1101, Manitowoc County

Battery storage project J1101, Manitowoc County is a 20.0 MW battery storage request withdrawn in the MISO interconnection queue, in Manitowoc County, Wisconsin, connecting to American Transmission Co..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. ConsentedApr 2021 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1101
Grid region
MISO (Midcontinent)
Utility / transmission owner
American Transmission Co.
Connection point (POI)
Kewaunee 138kV Substation
Location
Manitowoc County, Wisconsin
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Withdrawn
Queue status
Withdrawn
Entered queue
12 March 2018
Agreement signed
12 April 2021
Proposed online date
August 2023
Withdrawn
November 2025

Location

Marker shows the centre of Manitowoc County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Manitowoc County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem