GAS · WESTGas project 27, Silver Bow County
Gas project 27, Silver Bow County is a 53.0 MW gas request built and operating in the West interconnection queue, in Silver Bow County, Montana, connecting to NorthWestern Energy.
Request details
- Queue ID
- 27
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- MHD Substation
- Location
- Silver Bow County, Montana
- Technology
- Gas: 53.0 MW
- Total requested
- 53.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study System Impact Study Facilities Study
- Queue status
- Operational
- Entered queue
- 25 February 2003
- Proposed online date
- May 2006
- Came online
- May 2006
Location
Marker shows the centre of Silver Bow County; the queue data does not give exact sites.
Other requests in Silver Bow County
- Gas project 377, Silver Bow CountyGas · 36.0 MW · suspended
- Gas project 389, Silver Bow CountyGas · 576 MW · withdrawn
- Gas project G0650, Silver Bow CountyGas · 576 MW · withdrawn
- Continental Energy SvcsGas · 400 MW · withdrawn
- Gas project 74, Silver Bow CountyGas · 280 MW · withdrawn
- Solar + storage project 365, Silver Bow CountySolar + storage · 150 MW · withdrawn
- Solar + storage project 397, Silver Bow CountySolar + storage · 120 MW · withdrawn
- Gas project 322, Silver Bow CountyGas · 113 MW · withdrawn
- Battery storage project 374, Silver Bow CountyBattery storage · 75.0 MW · withdrawn
- Solar project 279, Silver Bow CountySolar · 50.0 MW · withdrawn
- Solar project 313, Silver Bow CountySolar · 50.0 MW · withdrawn
- Solar project 314, Silver Bow CountySolar · 30.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem