United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

SOLAR Β· WEST

Solar project 314, Silver Bow County

Solar project 314, Silver Bow County is a 30.0 MW solar request withdrawn in the West interconnection queue, in Silver Bow County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
314
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Butte MHD Substation
Location
Silver Bow County, Montana
Technology
Solar: 30.0 MW
Total requested
30.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
14 March 2017
Proposed online date
September 2018

Location

Marker shows the centre of Silver Bow County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Silver Bow County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem