United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

SOLAR Β· WEST

Solar project 279, Silver Bow County

Solar project 279, Silver Bow County is a 50.0 MW solar request withdrawn in the West interconnection queue, in Silver Bow County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
279
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Butte MHD Substation Butte, MT
Location
Silver Bow County, Montana
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
10 May 2016
Proposed online date
November 2017

Location

Marker shows the centre of Silver Bow County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Silver Bow County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem