United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

SOLAR + STORAGE Β· WEST

Solar + storage project 365, Silver Bow County

Solar + storage project 365, Silver Bow County is a 150 MW solar + storage request withdrawn in the West interconnection queue, in Silver Bow County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
365
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
230kV between Anaconda Mill Creek and South Butte
Location
Silver Bow County, Montana
Technology
Solar: 150 MW Β· Battery
Total requested
150 MW
Service type
NRIS and ERIS
Study phase
Sysytem Impact
Queue status
Withdrawn
Entered queue
14 August 2019
Proposed online date
December 2020

Location

Marker shows the centre of Silver Bow County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Silver Bow County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem