Solar project GEN-2020-017, Lamb County

Solar project GEN-2020-017, Lamb County is a 74.9 MW solar request withdrawn in the SPP interconnection queue, in Lamb County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2025 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2020-017
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
230kV Lamb County Interchange
Location
Lamb County, Texas
Technology
Solar: 74.9 MW
Total requested
74.9 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
24 April 2020
Proposed online date
December 2025
Came online
December 2025
Withdrawn
April 2025

Location

Marker shows the centre of Lamb County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Lamb County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem