United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2023-176, Lamb County
Onshore wind project GEN-2023-176, Lamb County is a 300 MW onshore wind request withdrawn in the SPP interconnection queue, in Lamb County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-176
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Plant X 230 kV Substation
- Location
- Lamb County, Texas
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2030
- Withdrawn
- August 2025
Location
Marker shows the centre of Lamb County; the queue data does not give exact sites.
Other requests in Lamb County
- Solar project GEN-2023-GR5, Lamb CountySolar Β· 150 MW Β· agreement signed
- Solar project GEN-2024-063, Lamb CountySolar Β· 256 MW Β· in study
- Gas project ERAS-2025-016, Lamb CountyGas Β· 233 MW Β· in study
- Solar project GEN-2022-036, Lamb CountySolar Β· 1,000 MW Β· withdrawn
- Solar project GEN-2017-219, Lamb CountySolar Β· 600 MW Β· withdrawn
- Solar project GEN-2017-218, Lamb CountySolar Β· 600 MW Β· withdrawn
- Solar project GEN-2017-080, Lamb CountySolar Β· 525 MW Β· withdrawn
- Solar project GEN-2022-056, Lamb CountySolar Β· 300 MW Β· withdrawn
- Solar project GEN-2017-217, Lamb CountySolar Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2022-201, Lamb CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2008-072, Lamb CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2022-035, Lamb CountyOnshore wind Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem