ONSHORE WIND Β· SPP

Onshore wind project GEN-2008-072, Lamb County

Onshore wind project GEN-2008-072, Lamb County is a 300 MW onshore wind request withdrawn in the SPP interconnection queue, in Lamb County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2008-072
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Location
Lamb County, Texas
Technology
Wind: 300 MW
Total requested
300 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
16 July 2008
Proposed online date
January 2011

Location

Marker shows the centre of Lamb County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Lamb County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem