OTHER Β· MISOOther project G094, Butler County
Other project G094, Butler County is a 30.0 MW other request withdrawn in the MISO interconnection queue, in Butler County, Ohio.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2001 (completed)
- Withdrawn / abandonedApr 2003 (project stopped here)
- ConsentedApr 2003 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G094
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Butler County, Ohio
- Technology
- Other: 30.0 MW
- Total requested
- 30.0 MW
- Queue status
- Withdrawn
- Entered queue
- 18 May 2001
- Agreement signed
- 17 April 2003
- Proposed online date
- June 2002
- Withdrawn
- April 2003
Location
Marker shows the centre of Butler County; the queue data does not give exact sites.
Other requests in Butler County
- Woodsdale Renewable Energy CenterSolar Β· 49.0 MW Β· agreement signed
- Solar project AI1-092, Butler CountySolar Β· 49.9 MW Β· in study
- Solar + storage project AI1-150, Butler CountySolar + storage Β· 49.9 MW Β· in study
- Middletown Energy CenterGas Β· 513 MW Β· built
- Meldahl Hydroelectric PlantHydro Β· 112 MW Β· built
- Other project G941, Butler CountyOther Β· 67.0 MW Β· built
- Coal project G837, Butler CountyCoal Β· 25.0 MW Β· built
- Other project G098, Butler CountyOther Β· 165 MW Β· withdrawn
- Gas project W1-058A_DK1, Butler CountyGas Β· 135 MW Β· withdrawn
- Gas project J120, Butler CountyGas Β· 135 MW Β· withdrawn
- Solar project AD2-146, Butler CountySolar Β· 100 MW Β· withdrawn
- Solar project AD2-147, Butler CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem