Flying Wing Solar (Fka Genesis Solar)

Flying Wing Solar (Fka Genesis Solar) is a 250 MW solar request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2006 (completed)
  2. Withdrawn / abandonedApr 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
154
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Windhub 230 kV Substation
Location
Kern County, California
Technology
Solar: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 November 2006
Proposed online date
June 2015
Withdrawn
April 2013

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.