United States › Grid › Interconnection queues › Indiana

ONSHORE WIND · PJM

Fowler Ridge 4 WF

Fowler Ridge 4 WF is a 250 MW onshore wind request built and operating in the PJM interconnection queue, in Benton County, Indiana, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Feb 2006 (completed)
  2. ConsentedDec 2009 (completed)
  3. Construction (completed)
  4. OperatingDec 2015 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Q03
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Olive-Dequine 345kV
Location
Benton County, Indiana
Technology
Wind: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
13 February 2006
Agreement signed
22 December 2009
Proposed online date
December 2014
Came online
December 2015

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Indiana · Transmission lines in Indiana

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem