United States › Grid › Interconnection queues › Indiana

ONSHORE WIND · PJM

Fowler Ridge WF

Fowler Ridge WF is a 500 MW onshore wind request built and operating in the PJM interconnection queue, in Benton County, Indiana, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Feb 2006 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2008 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Q01
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Olive-Dequine 345kv
Location
Benton County, Indiana
Technology
Wind: 500 MW
Total requested
500 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
7 February 2006
Proposed online date
July 2009
Came online
December 2008

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Indiana · Transmission lines in Indiana

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem