SOLAR Β· WEST

Solar project 1202, San Juan County

Solar project 1202, San Juan County is a 300 MW solar request withdrawn in the West interconnection queue, in San Juan County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1202
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Pinto substation
Location
San Juan County, Utah
Technology
Solar: 300 MW
Total requested
300 MW
Service type
NRIS and ERIS
Study phase
Request assumed to be submitted to 2021 cluster
Queue status
Withdrawn
Entered queue
31 March 2020
Proposed online date
September 2022

Location

Marker shows the centre of San Juan County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in San Juan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem