United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR + STORAGE Β· WESTSolar + storage project C3-164, San Juan County
Solar + storage project C3-164, San Juan County is a 200 MW solar + storage request withdrawn in the West interconnection queue, in San Juan County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C3-164
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Pinto substation
- Location
- San Juan County, Utah
- Technology
- Solar: 200 MW Β· Battery
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 15 May 2023
- Proposed online date
- May 2027
Location
Marker shows the centre of San Juan County; the queue data does not give exact sites.
Other requests in San Juan County
- Battery storage project T2-075, San Juan CountyBattery storage Β· 300 MW Β· in study
- Solar + storage project T2-071, San Juan CountySolar + storage Β· 199 MW Β· in study
- Onshore wind project 384, San Juan CountyOnshore wind Β· 60.0 MW Β· built
- Gas project C4-083, San Juan CountyGas Β· 525 MW Β· withdrawn
- Onshore wind project C4-020, San Juan CountyOnshore wind Β· 402 MW Β· withdrawn
- Battery storage project C3-167, San Juan CountyBattery storage Β· 300 MW Β· withdrawn
- Solar project 1202, San Juan CountySolar Β· 300 MW Β· withdrawn
- Solar + storage project 1224, San Juan CountySolar + storage Β· 250 MW Β· withdrawn
- Solar project 819, San Juan CountySolar Β· 240 MW Β· withdrawn
- Solar + storage project C1-06, San Juan CountySolar + storage Β· 200 MW Β· withdrawn
- Solar + storage project C1-07, San Juan CountySolar + storage Β· 200 MW Β· withdrawn
- Solar + storage project C2-148, San Juan CountySolar + storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem