United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

GAS Β· WEST

Gas project C4-083, San Juan County

Gas project C4-083, San Juan County is a 525 MW gas request withdrawn in the West interconnection queue, in San Juan County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C4-083
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Pinto substation
Location
San Juan County, Utah
Technology
Gas: 525 MW Β· Battery
Total requested
525 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
15 May 2024
Proposed online date
December 2028

Location

Marker shows the centre of San Juan County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in San Juan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem