United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

OTHER Β· MISO

Other project G950, St. Louis County

Other project G950, St. Louis County is a 25.0 MW other request withdrawn in the MISO interconnection queue, in St. Louis County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2008 (completed)
  2. Withdrawn / abandonedFeb 2009 (project stopped here)
  3. ConsentedFeb 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G950
Grid region
MISO (Midcontinent)
Connection point (POI)
Existing substation at the Laskin Site
Location
St. Louis County, Minnesota
Technology
Other: 25.0 MW
Total requested
25.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
16 January 2008
Agreement signed
9 February 2009
Proposed online date
December 2009
Withdrawn
February 2009

Location

Marker shows the centre of St. Louis County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in St. Louis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem