ONSHORE WIND Β· MISO

Onshore wind project J3405, St. Louis County

Onshore wind project J3405, St. Louis County is a 144 MW onshore wind request withdrawn in the MISO interconnection queue, in St. Louis County, Minnesota, connecting to MINNESOTA POWER INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3405
Grid region
MISO (Midcontinent)
Utility / transmission owner
MINNESOTA POWER INC.
Connection point (POI)
Shannon - Minntac 230kV
Location
St. Louis County, Minnesota
Technology
Wind: 144 MW
Total requested
144 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
10 April 2024
Proposed online date
June 2028
Withdrawn
September 2025

Location

Marker shows the centre of St. Louis County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in St. Louis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem