United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
BATTERY STORAGE Β· MISOBattery storage project J2569, St. Louis County
Battery storage project J2569, St. Louis County is a 300 MW battery storage request withdrawn in the MISO interconnection queue, in St. Louis County, Minnesota, connecting to MINNESOTA POWER INC..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2569
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MINNESOTA POWER INC.
- Connection point (POI)
- Arrowhead 115 kV Substation
- Location
- St. Louis County, Minnesota
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- May 2026
- Withdrawn
- October 2025
Location
Marker shows the centre of St. Louis County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in St. Louis County
- Onshore wind project G424, St. Louis CountyOnshore wind Β· 100 MW Β· built
- Gas project G591, St. Louis CountyGas Β· 700 MW Β· withdrawn
- Coal project G477, St. Louis CountyCoal Β· 552 MW Β· withdrawn
- Onshore wind project G377, St. Louis CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J3405, St. Louis CountyOnshore wind Β· 144 MW Β· withdrawn
- Onshore wind project G509, St. Louis CountyOnshore wind Β· 75.0 MW Β· withdrawn
- Onshore wind project G329, St. Louis CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project G660, St. Louis CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Other project J175, St. Louis CountyOther Β· 30.0 MW Β· withdrawn
- Other project G950, St. Louis CountyOther Β· 25.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem