ONSHORE WIND Β· MISO

Onshore wind project G509, St. Louis County

Onshore wind project G509, St. Louis County is a 75.0 MW onshore wind request withdrawn in the MISO interconnection queue, in St. Louis County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2005 (completed)
  2. Withdrawn / abandonedJun 2006 (project stopped here)
  3. ConsentedJun 2006 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G509
Grid region
MISO (Midcontinent)
Connection point (POI)
MP's #34 (115kV) line, approx 2-4 miles NW of Project Site
Location
St. Louis County, Minnesota
Technology
Wind: 75.0 MW
Total requested
75.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
18 March 2005
Agreement signed
22 June 2006
Proposed online date
December 2006
Withdrawn
June 2006

Location

Marker shows the centre of St. Louis County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in St. Louis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem