United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project G377, St. Louis County
Onshore wind project G377, St. Louis County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in St. Louis County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2003 (completed)
- Withdrawn / abandonedMar 2004 (project stopped here)
- ConsentedMar 2004 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G377
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- St. Louis County, Minnesota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 18 November 2003
- Agreement signed
- 5 March 2004
- Proposed online date
- November 2004
- Withdrawn
- March 2004
Location
Marker shows the centre of St. Louis County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in St. Louis County
- Onshore wind project G424, St. Louis CountyOnshore wind Β· 100 MW Β· built
- Gas project G591, St. Louis CountyGas Β· 700 MW Β· withdrawn
- Coal project G477, St. Louis CountyCoal Β· 552 MW Β· withdrawn
- Battery storage project J2569, St. Louis CountyBattery storage Β· 300 MW Β· withdrawn
- Onshore wind project J3405, St. Louis CountyOnshore wind Β· 144 MW Β· withdrawn
- Onshore wind project G509, St. Louis CountyOnshore wind Β· 75.0 MW Β· withdrawn
- Onshore wind project G329, St. Louis CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project G660, St. Louis CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Other project J175, St. Louis CountyOther Β· 30.0 MW Β· withdrawn
- Other project G950, St. Louis CountyOther Β· 25.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem