United States βΊ Grid βΊ Interconnection queues βΊ New Mexico
OTHER Β· SPPOther project GEN-2001-021, Eddy County
Other project GEN-2001-021, Eddy County is a 200 MW other request withdrawn in the SPP interconnection queue, in Eddy County, New Mexico, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2001-021
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Location
- Eddy County, New Mexico
- Technology
- Other: 200 MW
- Total requested
- 200 MW
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 4 June 2001
Location
Marker shows the centre of Eddy County; the queue data does not give exact sites.
Power plants in New Mexico Β· Transmission lines in New Mexico
Other requests in Eddy County
- Battery storage project GEN-2024-246, Eddy CountyBattery storage Β· 199 MW Β· in study
- Battery storage project GEN-2024-251, Eddy CountyBattery storage Β· 125 MW Β· in study
- Battery storage project GEN-2024-295, Eddy CountyBattery storage Β· 115 MW Β· in study
- EC250W ProjectOnshore wind Β· 250 MW Β· withdrawn
- Gas project GEN-2018-075, Eddy CountyGas Β· 230 MW Β· withdrawn
- Solar project GEN-2024-147, Eddy CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2007-001, Eddy CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project GEN-2023-184, Eddy CountySolar Β· 200 MW Β· withdrawn
- Battery storage project GEN-2024-347, Eddy CountyBattery storage Β· 199 MW Β· withdrawn
- Onshore wind project GEN-2006-048, Eddy CountyOnshore wind Β· 150 MW Β· withdrawn
- Battery storage project GEN-2022-128, Eddy CountyBattery storage Β· 150 MW Β· withdrawn
- Solar project GEN-2014-069, Eddy CountySolar Β· 90.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem