United States › Grid › Interconnection queues › New Mexico
BATTERY STORAGE · SPPBattery storage project GEN-2024-246, Eddy County
Battery storage project GEN-2024-246, Eddy County is a 199 MW battery storage request in interconnection study in the SPP interconnection queue, in Eddy County, New Mexico, connecting to SPS.
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-246
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- North Loving 115 kV Substation
- Location
- Eddy County, New Mexico
- Technology
- Battery: 199 MW
- Total requested
- 199 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 1 March 2025
- Proposed online date
- December 2029
Location
Marker shows the centre of Eddy County; the queue data does not give exact sites.
Power plants in New Mexico · Transmission lines in New Mexico
Other requests in Eddy County
- Battery storage project GEN-2024-251, Eddy CountyBattery storage · 125 MW · in study
- Battery storage project GEN-2024-295, Eddy CountyBattery storage · 115 MW · in study
- EC250W ProjectOnshore wind · 250 MW · withdrawn
- Gas project GEN-2018-075, Eddy CountyGas · 230 MW · withdrawn
- Solar project GEN-2024-147, Eddy CountySolar · 200 MW · withdrawn
- Onshore wind project GEN-2007-001, Eddy CountyOnshore wind · 200 MW · withdrawn
- Other project GEN-2001-021, Eddy CountyOther · 200 MW · withdrawn
- Solar project GEN-2023-184, Eddy CountySolar · 200 MW · withdrawn
- Battery storage project GEN-2024-347, Eddy CountyBattery storage · 199 MW · withdrawn
- Onshore wind project GEN-2006-048, Eddy CountyOnshore wind · 150 MW · withdrawn
- Battery storage project GEN-2022-128, Eddy CountyBattery storage · 150 MW · withdrawn
- Solar project GEN-2014-069, Eddy CountySolar · 90.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem