ONSHORE WIND Β· WESTEC250W Project
EC250W Project is a 250 MW onshore wind request withdrawn in the West interconnection queue, in Eddy County, New Mexico, connecting to El Paso Electric Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedNov 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LG-18-3-1
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- El Paso Electric Company
- Connection point (POI)
- Eddy County DC Tie Substaton
- Location
- Eddy County, New Mexico
- Technology
- Wind: 250 MW
- Total requested
- 250 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 29 March 2018
- Proposed online date
- September 2020
- Withdrawn
- November 2018
Location
Marker shows the centre of Eddy County; the queue data does not give exact sites.
Power plants in New Mexico Β· Transmission lines in New Mexico
Other requests in Eddy County
- Battery storage project GEN-2024-246, Eddy CountyBattery storage Β· 199 MW Β· in study
- Battery storage project GEN-2024-251, Eddy CountyBattery storage Β· 125 MW Β· in study
- Battery storage project GEN-2024-295, Eddy CountyBattery storage Β· 115 MW Β· in study
- Gas project GEN-2018-075, Eddy CountyGas Β· 230 MW Β· withdrawn
- Solar project GEN-2024-147, Eddy CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2007-001, Eddy CountyOnshore wind Β· 200 MW Β· withdrawn
- Other project GEN-2001-021, Eddy CountyOther Β· 200 MW Β· withdrawn
- Solar project GEN-2023-184, Eddy CountySolar Β· 200 MW Β· withdrawn
- Battery storage project GEN-2024-347, Eddy CountyBattery storage Β· 199 MW Β· withdrawn
- Onshore wind project GEN-2006-048, Eddy CountyOnshore wind Β· 150 MW Β· withdrawn
- Battery storage project GEN-2022-128, Eddy CountyBattery storage Β· 150 MW Β· withdrawn
- Solar project GEN-2014-069, Eddy CountySolar Β· 90.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem