United States β€Ί Grid β€Ί Interconnection queues β€Ί New Mexico

GAS Β· SPP

Gas project GEN-2018-075, Eddy County

Gas project GEN-2018-075, Eddy County is a 230 MW gas request withdrawn in the SPP interconnection queue, in Eddy County, New Mexico, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2018 (completed)
  2. Withdrawn / abandonedApr 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-075
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Kiowa Substation 115kV (90753)
Location
Eddy County, New Mexico
Technology
Gas: 230 MW
Total requested
230 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
26 October 2018
Proposed online date
September 2021
Withdrawn
April 2019

Location

Marker shows the centre of Eddy County; the queue data does not give exact sites.

Power plants in New Mexico Β· Transmission lines in New Mexico

Other requests in Eddy County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem