United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· MISO

Onshore wind project J154, Washington County

Onshore wind project J154, Washington County is a 500 MW onshore wind request withdrawn in the MISO interconnection queue, in Washington County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2010 (completed)
  2. Withdrawn / abandonedMay 2012 (project stopped here)
  3. ConsentedMay 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J154
Grid region
MISO (Midcontinent)
Connection point (POI)
Grimes 161 kV substation
Location
Washington County, Iowa
Technology
Wind: 500 MW
Total requested
500 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
28 June 2010
Agreement signed
17 May 2012
Proposed online date
January 2011
Withdrawn
May 2012

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem