ONSHORE WIND Β· MISO

Onshore wind project G973, Washington County

Onshore wind project G973, Washington County is a 501 MW onshore wind request withdrawn in the MISO interconnection queue, in Washington County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2008 (completed)
  2. Withdrawn / abandonedJul 2010 (project stopped here)
  3. ConsentedJul 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G973
Grid region
MISO (Midcontinent)
Connection point (POI)
Hills - Sub T 345 kV
Location
Washington County, Iowa
Technology
Wind: 501 MW
Total requested
501 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
15 February 2008
Agreement signed
29 July 2010
Proposed online date
January 2011
Withdrawn
July 2010

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem