United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMASD Warner PA2 Solar LLC
ASD Warner PA2 Solar LLC is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Tioga County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-160
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Developer
- ASD Warner PA2 Solar LLC
- Connection point (POI)
- Tower Hill 34.5 kV
- Location
- Tioga County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 31 August 2021
- Proposed online date
- November 2023
- Withdrawn
- March 2025
Location
Marker shows the centre of Tioga County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Tioga County
- Solar project AH2-115, Tioga CountySolar · 85.0 MW · in study
- Blossburg Station Unit 1Gas · 2.5 MW · built
- Tioga County PowerGas · 550 MW · withdrawn
- Gas project D24, Tioga CountyGas · 500 MW · withdrawn
- Gas project AA2-120, Tioga CountyGas · 250 MW · withdrawn
- Onshore wind project Q33, Tioga CountyOnshore wind · 150 MW · withdrawn
- Mainesburg ESSBattery storage · 130 MW · withdrawn
- Battery storage project AF2-412, Tioga CountyBattery storage · 100 MW · withdrawn
- Cherry FlatsOnshore wind · 90.0 MW · withdrawn
- Onshore wind project R45, Tioga CountyOnshore wind · 70.0 MW · withdrawn
- Solar project AG2-433, Tioga CountySolar · 50.0 MW · withdrawn
- Solar project AH2-188, Tioga CountySolar · 35.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem