πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· MISO

Onshore wind project J773, Codington County

Onshore wind project J773, Codington County is a 400 MW onshore wind request withdrawn in the MISO interconnection queue, in Codington County, South Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandonedJul 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J773
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Codington County, South Dakota
Technology
Wind: 400 MW
Total requested
400 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
14 November 2016
Proposed online date
September 2019
Withdrawn
July 2017

Location

Marker shows the centre of Codington County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Codington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem