United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project J774, Codington County
Onshore wind project J774, Codington County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Codington County, South Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedJul 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J774
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Codington County, South Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 14 November 2016
- Proposed online date
- September 2019
- Withdrawn
- July 2017
Location
Marker shows the centre of Codington County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Codington County
- Onshore wind project J722, Codington CountyOnshore wind Β· 200 MW Β· under construction
- Surplus; J442Other Β· 120 MW Β· in study
- Surplus; G736Other Β· 120 MW Β· in study
- Onshore wind project J436, Codington CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project J437, Codington CountyOnshore wind Β· 150 MW Β· built
- Other project GI-0219, Codington CountyOther Β· 7.5 MW Β· built
- Onshore wind project J773, Codington CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GI-0118, Codington CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GI-0103, Codington CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GI-0902, Codington CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J133, Codington CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J721, Codington CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem