United States › Grid › Interconnection queues › Pennsylvania
ONSHORE WIND · PJMPotter Wind Farm
Potter Wind Farm is a 75.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Potter County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2007 (completed)
- Withdrawn / abandonedFeb 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- T121
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Potter-Gold 115kV
- Location
- Potter County, Pennsylvania
- Technology
- Wind: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 28 December 2007
- Proposed online date
- December 2017
- Withdrawn
- February 2016
Location
Marker shows the centre of Potter County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Potter County
- Potter SolarSolar · 35.0 MW · agreement signed
- Big Level Wind FarmOnshore wind · 70.0 MW · built
- Big Level Wind FarmOnshore wind · 20.0 MW · built
- Solar project AE2-146, Potter CountySolar · 183 MW · withdrawn
- Onshore wind project AC1-187, Potter CountyOnshore wind · 117 MW · withdrawn
- Onshore wind project Q24, Potter CountyOnshore wind · 101 MW · withdrawn
- Onshore wind project Y1-032, Potter CountyOnshore wind · 99.0 MW · withdrawn
- GoldOnshore wind · 99.0 MW · withdrawn
- Solar project AG2-463, Potter CountySolar · 80.0 MW · withdrawn
- Gold SabinsvilleOnshore wind · 50.0 MW · withdrawn
- Onshore wind project AH1-002, Potter CountyOnshore wind · 50.0 MW · withdrawn
- Potter WFOnshore wind · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem