United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMSolar project AE2-146, Potter County
Solar project AE2-146, Potter County is a 183 MW solar request withdrawn in the PJM interconnection queue, in Potter County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedSep 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-146
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Gold 115 kV
- Location
- Potter County, Pennsylvania
- Technology
- Solar: 183 MW
- Total requested
- 183 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 11 March 2019
- Proposed online date
- March 2021
- Withdrawn
- September 2019
Location
Marker shows the centre of Potter County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Potter County
- Potter SolarSolar Β· 35.0 MW Β· agreement signed
- Big Level Wind FarmOnshore wind Β· 70.0 MW Β· built
- Big Level Wind FarmOnshore wind Β· 20.0 MW Β· built
- Onshore wind project AC1-187, Potter CountyOnshore wind Β· 117 MW Β· withdrawn
- Onshore wind project Q24, Potter CountyOnshore wind Β· 101 MW Β· withdrawn
- Onshore wind project Y1-032, Potter CountyOnshore wind Β· 99.0 MW Β· withdrawn
- GoldOnshore wind Β· 99.0 MW Β· withdrawn
- Solar project AG2-463, Potter CountySolar Β· 80.0 MW Β· withdrawn
- Potter Wind FarmOnshore wind Β· 75.0 MW Β· withdrawn
- Gold SabinsvilleOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project AH1-002, Potter CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Potter WFOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem