ONSHORE WIND · PJM

Big Level Wind Farm

Big Level Wind Farm is a 20.0 MW onshore wind request built and operating in the PJM interconnection queue, in Potter County, Pennsylvania, connecting to PENELEC.

Queue statusOperating
  1. PlanningQueued Oct 2015 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 2019 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AB1-160
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Gold-Sabinsville 115kV
Location
Potter County, Pennsylvania
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
30 October 2015
Proposed online date
October 2019
Came online
November 2019

Location

Marker shows the centre of Potter County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Potter County