United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 238, Taylor County
Solar project 238, Taylor County is a 74.5 MW solar request withdrawn in the Southeast interconnection queue, in Taylor County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 238
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Fresh Air Energy II, LLC
- Connection point (POI)
- Perry Substation
- Location
- Taylor County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 7 August 2018
- Proposed online date
- December 2021
Location
Marker shows the centre of Taylor County; the queue data does not give exact sites.
Other requests in Taylor County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem