United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

GAS Β· SOUTHEAST

Gas project 94, Taylor County

Gas project 94, Taylor County is a 1,268 MW gas request withdrawn in the Southeast interconnection queue, in Taylor County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
94
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Masked
Connection point (POI)
Perry Substation
Location
Taylor County, Florida
Technology
Gas: 1,268 MW
Total requested
1,268 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
11 August 2008
Proposed online date
June 2013

Location

Marker shows the centre of Taylor County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Taylor County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem