GAS Β· SOUTHEASTGas project 91, Perry County
Gas project 91, Perry County is a 293 MW gas request withdrawn in the Southeast interconnection queue, in Perry County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 91
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Connection point (POI)
- Perry Substation
- Location
- Perry County, Florida
- Technology
- Gas: 293 MW
- Total requested
- 293 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 31 July 2008
- Proposed online date
- June 2013
Location
Marker shows the centre of Perry County; the queue data does not give exact sites.
Other requests in Perry County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem