BATTERY STORAGE Β· ERCOTFairgreen BESS
Fairgreen BESS is a 201 MW battery storage request withdrawn in the ERCOT interconnection queue, in Howard County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0141
- Grid region
- ERCOT (Texas)
- Developer
- Fairgreen BESS, LLC
- Connection point (POI)
- Tap 138kV 1322 BIGSPRIG_8 - 11351 HILLCREST_8
- Location
- Howard County, Texas
- Technology
- Battery: 201 MW
- Total requested
- 201 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- September 2026
- Withdrawn
- November 2025
Location
Marker shows the centre of Howard County; the queue data does not give exact sites.
Other requests in Howard County
- Ariji BESSBattery storage Β· 100 MW Β· agreement signed
- Infinium SolarSolar Β· 402 MW Β· in study
- Crater BESSBattery storage Β· 302 MW Β· in study
- Bhalu StorageBattery storage Β· 206 MW Β· in study
- Les Energy StorageBattery storage Β· 205 MW Β· in study
- Carolina Storage MidlandBattery storage Β· 205 MW Β· in study
- Prospector Energy StorageBattery storage Β· 205 MW Β· in study
- Carolina Storage OdessaBattery storage Β· 203 MW Β· in study
- Rattlesnake Gap Wind SLFOnshore wind Β· 200 MW Β· in study
- Prairie Blossom StorageBattery storage Β· 123 MW Β· in study
- Luthor SolarSolar Β· 101 MW Β· in study
- Calf Creek StorageBattery storage Β· 101 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem