BATTERY STORAGE Β· ERCOT

Fairgreen BESS

Fairgreen BESS is a 201 MW battery storage request withdrawn in the ERCOT interconnection queue, in Howard County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0141
Grid region
ERCOT (Texas)
Developer
Fairgreen BESS, LLC
Connection point (POI)
Tap 138kV 1322 BIGSPRIG_8 - 11351 HILLCREST_8
Location
Howard County, Texas
Technology
Battery: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 September 2022
Proposed online date
September 2026
Withdrawn
November 2025

Location

Marker shows the centre of Howard County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Howard County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem