United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project G614, Emmet County
Onshore wind project G614, Emmet County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Emmet County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2006 (completed)
- Withdrawn / abandonedMar 2013 (project stopped here)
- ConsentedJul 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G614
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Lakefield Junction - Fox Lake 161 kV
- Location
- Emmet County, Iowa
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- Optional
- Queue status
- Withdrawn
- Entered queue
- 24 March 2006
- Agreement signed
- 3 July 2012
- Proposed online date
- May 2009
- Withdrawn
- March 2013
Location
Marker shows the centre of Emmet County; the queue data does not give exact sites.
Other requests in Emmet County
- Onshore wind project J462, Emmet CountyOnshore wind Β· 598 MW Β· withdrawn
- Onshore wind project J439, Emmet CountyOnshore wind Β· 500 MW Β· withdrawn
- Onshore wind project G957, Emmet CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2017-025, Emmet CountyOnshore wind Β· 74.0 MW Β· withdrawn
- Onshore wind project G730, Emmet CountyOnshore wind Β· 73.5 MW Β· withdrawn
- Onshore wind project G552, Emmet CountyOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem