Onshore wind project G614, Emmet County

Onshore wind project G614, Emmet County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Emmet County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2006 (completed)
  2. Withdrawn / abandonedMar 2013 (project stopped here)
  3. ConsentedJul 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G614
Grid region
MISO (Midcontinent)
Connection point (POI)
Lakefield Junction - Fox Lake 161 kV
Location
Emmet County, Iowa
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
Optional
Queue status
Withdrawn
Entered queue
24 March 2006
Agreement signed
3 July 2012
Proposed online date
May 2009
Withdrawn
March 2013

Location

Marker shows the centre of Emmet County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Emmet County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem