United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
BATTERY STORAGE Β· MISOBattery storage project J2479, Concordia Parish County
Battery storage project J2479, Concordia Parish County is a 140 MW battery storage request withdrawn in the MISO interconnection queue, in Concordia Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2479
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- Red Gum to Metropolis 115 kV
- Location
- Concordia Parish County, Louisiana
- Technology
- Battery: 140 MW
- Total requested
- 140 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 September 2022
- Proposed online date
- October 2025
- Withdrawn
- March 2023
Location
Marker shows the centre of Concordia Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Concordia Parish County
- Other project J868, Concordia Parish CountyOther Β· 37.2 MW Β· under construction
- Solar project J2228, Concordia Parish CountySolar Β· 200 MW Β· in study
- Solar project J1953, Concordia Parish CountySolar Β· 265 MW Β· withdrawn
- Solar + storage project J2904, Concordia Parish CountySolar + storage Β· 150 MW Β· withdrawn
- Solar project J2792, Concordia Parish CountySolar Β· 150 MW Β· withdrawn
- Battery storage project J3046, Concordia Parish CountyBattery storage Β· 140 MW Β· withdrawn
- Solar project J565, Concordia Parish CountySolar Β· 102 MW Β· withdrawn
- Solar project J3272, Concordia Parish CountySolar Β· 85.0 MW Β· withdrawn
- Solar project J2430, Concordia Parish CountySolar Β· 80.0 MW Β· withdrawn
- Solar project J551, Concordia Parish CountySolar Β· 49.8 MW Β· withdrawn
- Solar project J635, Concordia Parish CountySolar Β· 35.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem