United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J551, Concordia Parish County
Solar project J551, Concordia Parish County is a 49.8 MW solar request withdrawn in the MISO interconnection queue, in Concordia Parish County, Louisiana.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2016 (completed)
- Withdrawn / abandonedMar 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J551
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Concordia Parish County, Louisiana
- Technology
- Solar: 49.8 MW
- Total requested
- 49.8 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 14 March 2016
- Proposed online date
- April 2018
- Withdrawn
- March 2017
Location
Marker shows the centre of Concordia Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Concordia Parish County
- Other project J868, Concordia Parish CountyOther Β· 37.2 MW Β· under construction
- Solar project J2228, Concordia Parish CountySolar Β· 200 MW Β· in study
- Solar project J1953, Concordia Parish CountySolar Β· 265 MW Β· withdrawn
- Solar + storage project J2904, Concordia Parish CountySolar + storage Β· 150 MW Β· withdrawn
- Solar project J2792, Concordia Parish CountySolar Β· 150 MW Β· withdrawn
- Battery storage project J2479, Concordia Parish CountyBattery storage Β· 140 MW Β· withdrawn
- Battery storage project J3046, Concordia Parish CountyBattery storage Β· 140 MW Β· withdrawn
- Solar project J565, Concordia Parish CountySolar Β· 102 MW Β· withdrawn
- Solar project J3272, Concordia Parish CountySolar Β· 85.0 MW Β· withdrawn
- Solar project J2430, Concordia Parish CountySolar Β· 80.0 MW Β· withdrawn
- Solar project J635, Concordia Parish CountySolar Β· 35.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem