United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project J977, Jackson County
Onshore wind project J977, Jackson County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Jackson County, Minnesota, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J977
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Jackson North 161kV Substation
- Location
- Jackson County, Minnesota
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- March 2021
- Withdrawn
- March 2020
Location
Marker shows the centre of Jackson County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Jackson County
- Onshore wind project J4099, Jackson CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project J2730, Jackson CountyBattery storage Β· 150 MW Β· in study
- Other project L009, Jackson CountyOther Β· -11.0 MW Β· in study
- Onshore wind project G826, Jackson CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G514, Jackson CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project G426, Jackson CountyOnshore wind Β· 101 MW Β· built
- Onshore wind project G536, Jackson CountyOnshore wind Β· 20.0 MW Β· built
- Onshore wind project G667, Jackson CountyOnshore wind Β· 13.0 MW Β· built
- Onshore wind project G518, Jackson CountyOnshore wind Β· 8.0 MW Β· built
- Onshore wind project G251, Jackson CountyOnshore wind Β· 6.0 MW Β· built
- Onshore wind project J594, Jackson CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project H060, Jackson CountyOnshore wind Β· 270 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem