SOLAR · PJM

Preston County Solar Project

Preston County Solar Project is a 48.9 MW solar request withdrawn in the PJM interconnection queue, in Preston County, West Virginia, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2025 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-340
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Developer
Rockville Solar LLC
Connection point (POI)
Cheat Lake-Ruthbelle 138 kV
Location
Preston County, West Virginia
Technology
Solar: 48.9 MW
Total requested
48.9 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
7 March 2025
Proposed online date
May 2024
Withdrawn
November 2025

Location

Marker shows the centre of Preston County; the queue data does not give exact sites.

Power plants in West Virginia · Transmission lines in West Virginia

Other requests in Preston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem